HPP (Hydro power plant) Margecany

HPP (Hydro power plant) Margecany

Activity: Reservoirs, ponds and water works

Hydroelectricity including weir and the access road and salmon-leap on the river Hornád in the cadastral Margecany (Eastern Slovakia, District Gelnica)
Movable weir

  • weir construction: concrete and bag
  • overspill edge: moving
  • construction of the spillway edge: the rubber bag
  • the number of fields: 1 piece
  • spillway edge length: 24 m

Hydroelectric power
  • construction and architectural solutions: lower part of the building with a covered concrete brick upper structure
  • Turbine type: Kaplan
  • Quantity: 2 pieces
  • max. flow rate through the turbine: 5.5 m3/s
  • total absorption capacity HPP 11.0 m3/s
  • HPP total power: 500 kW
  • the expected electricity production. energy per year: 1,820,000 kWh

Town: Margecany

Water flow / reservoir: Hornád

 

Reference list

AGPOL s.r.o., Jungmannova 153/12, 779 00 Olomouc, Tel.: (+420) 585 208 453, email: agpol@agpol.cz
Pobočka Praha: Moskevská 448/42, 101 00 Praha - Vršovice, Tel.: (+420) 585 208 458
Pobočka Nový Jičín: Palackého 50, 741 01 Nový Jičín, Tel.: (+420) 724 075 811
Registered at the Registry Court in Ostrava, section C, folder 44995
Last update: November 21 2024    Visitors: 20288