Tečovice - become saturated polder (wetlands restoration and revitalization)

Activity: Reservoirs, ponds and water works

Purpose of the tank is environmental protection and flood tank functions. Scope of the area 6.4 ha
The construction consists of three building objects:

  1. The dam sprinkled with bottom outlet and overflow security.
  2. Revitalization inflow and margins site, wetlands
  3. Planting

The total reservoir volume poldelVc = 15 500 m3
Area max. Level1,84 ha
Protective (retention) Vr volumeVr = 14 500 m3
Constant storage volume VnVn = 1000 m3
The area sustained level0,245 ha
 
The reservoir bottom 195,60 m.o.s
Constant storage level196,50 m.o.s
Max.hladina197,50 m n.m.
Dimension emergency spillway197,40 m.o.s
The dimension of the dam198,00 m.o.s
 
Max. dam height1,50 m
The length of the dam374 m
Wondrous edge16,0 m
Bottom outlet – profile800 mm
throttling part300 mm

Real. year 2015 Real. costs CZK 5.6 miles

AGPOL s.r.o., Jungmannova 153/12, 779 00 Olomouc, Tel.: (+420) 585 208 453, email: agpol@agpol.cz
Pobočka Praha: Moskevská 448/42, 101 00 Praha - Vršovice, Tel.: (+420) 585 208 458
Pobočka Nový Jičín: Palackého 50, 741 01 Nový Jičín, Tel.: (+420) 724 075 811
Registered at the Registry Court in Ostrava, section C, folder 44995
Last update: November 21 2024    Visitors: 20201