Uničov - distribution of water supply to two pressure zones

Uničov - distribution of water supply to two pressure zones

Activity: Water Supply and WW, sewerage and sewage WWTPs

In connection with the separation of the distribution water network zone of Uničov into two pressure zones, there is also new demands on the transportation of treated water from storage and filling reservoirs of treated water in existing reservoirs lower pressure zone (LPZ) - ie. Underground reservoirs WT Benkov and reservoirs higher pressure band (HPZ) - Sibenik water tower. The pumping station pumps are installed, which allows separate pumping into reservoirs lower pressure zone to Benkov and ponds and tanks in higher WT of LPZ. LPZ pumping stations and HPZ and LPZ are always equipped with two pumps with separate displacements. Displacement pumps in WT Benkov follows the new discharge lines located between the pump and the reservoir Benkov. Displacement Pump LPZ builds on the existing discharge pipe lying between the pump and tower WT Uničov. The system is complemented object of regulation and management, data transfers.

AGPOL s.r.o., Jungmannova 153/12, 779 00 Olomouc, Tel.: (+420) 585 208 453, email: agpol@agpol.cz
Pobočka Praha: Moskevská 448/42, 101 00 Praha - Vršovice, Tel.: (+420) 585 208 458
Pobočka Nový Jičín: Palackého 50, 741 01 Nový Jičín, Tel.: (+420) 724 075 811
Registered at the Registry Court in Ostrava, section C, folder 44995
Last update: November 21 2024    Visitors: 20083